|
The images below illustrate the drilling program currently under way at Latin American Mineral's Paso Yobai Gold Project. The map figure shows, with red markings, six new trenches now being established at 25 metre intervals along the central portion of the trend. The existing trenches - indicated on the figure by green traces - are at 100 metre intervals.
Also visible on the figure are blue traces indicating 12 new diamond drill holes.
Drilling in progress; Core samples
|